This is the progress made till the end of 2nd week of modeling the "Boomerang" Bridge. Added the railings, lane railing walls, cables and anchors. The model is now over 1 Million polygons.
All cables and railings are just splines, so I can control the resolution. The walls were made with loft. The cable anchors have a turbosmooth modifier allowing me to control the resolution as needed.
Next I'll be doing the lighting posts.
-=CADartet Design Labs=-
cadartet@gmail.com
Sem comentários:
Enviar um comentário